Shell Space — Phase 1 Floor Plan

Shakopee Main Floor · Northeast Corner · 2,500 SF of 10,000 SF
Zone A — Electrolyte Preparation (600 SF)
Zone B — Cell Assembly & Chemistry (800 SF)
Zone C — Testing & Characterization (1,100 SF)
Phase 2/3 Expansion (7,500 SF)
SHELL SPACE — 10,000 SF — 100' × 100' PHASE 2 / 3 EXPANSION 7,500 SF available NORTH OFFICE CAFETERIA ZONE A Electrolyte Preparation 20' × 30' — 600 SF DeltaV Skid Purification Rosemount 228 / 372 ELITE Fisher Valves Metering Chemical Storage DI H₂O + MgCl₂ Fume Hood Exhaust to roof ↑ ZONE B Cell Assembly & Chemistry 20' × 40' — 800 SF Glovebox Ar atm / O₂ < 1 ppm Cell assembly Synthesis Bench CuFe-PBA cathode COP anode Afag Linear Motion Electrode coating Rosemount 928 Gas / 628-H₂ Fork Visc. Electrode Prep — Doctor Blade, Vacuum Oven, Punch ZONE C Testing & Characterization 26' × 42' — 1,100 SF NI HPS-17000 150 kW Battery Cycler CC-CV / CP / EIS NI PXI EIS platform Environmental Chamber -40 to 85°C ICP-OES Elemental EECOMOBILITY AI Analysis Workstation Load Bank → Shell Space LEDs → North Office NaOCl Dosing CN⁻ → CN⁻O detox Electrowinning Cu recovery (emew) Solvent Still NMP / DMSO recovery (rotovap) Lifecycle Assessment Bench Mass-balance instrumentation cycled cells → Cu recovery loop ZERO-DISCHARGE LOOP Electrowinning → Cu recovered to scrap/sensor mfg · Solvent still → 90–95% NMP/DMSO reused · NaOCl dosing → CN⁻ detox · Cycled-cell electrodes archived & recovered at Phase 2 scale 480V / 200A POWER RUN DI WATER SUPPLY ↑ EXHAUST ~100' (Phase 1: 50' active) + Eyewash F N
Each square = 5' × 5'  |  Scale: 6.4 px/ft
Phase 1 footprint: 2,500 SF  ·  Zones: A (600) + B (800) + C (1,100)  ·  Remaining: 7,500 SF for Phase 2/3
Zone A — Electrolyte Preparation
Zone B — Cell Assembly & Chemistry
Zone C — Testing & Characterization
Phase 1 occupies the northeast quadrant of the Shell Space. Zones are arranged for workflow: feedstock enters Zone A, purified electrolyte flows to Zone B for cell assembly, completed cells move to Zone C for testing. The remaining 7,500 SF accommodates Phase 2 pilot deployment and Phase 3 production line without relocating Phase 1 equipment. Power, water, and exhaust enter from the north wall (adjacent to North Office utilities). Load bank output feeds Shell Space lighting first, then North Office sub-panel.