CARD 09 · LIVE STATE

Where We Are Now

The state of the program — phase, tributaries, and the running manifest of what shipped last.

Active phase · Stage 1 Build
— The Spine —
Months -∞ → -1
Research
complete
Months 1 → 3
Stage 0 · Kill-Gate
$200K – $400K
Months 4 → 12
Stage 1 · Build
$1.0M – $1.8M · active
Months 12 → 24
Pilot Rack
on-site, Shakopee
Months 24 → 36
First Contact
customer-pilot
Months 36 → 48
Commercial Demo
~1 MWh container
Months 48+
Net Positive
self-powered
close ✕

— Tributaries · parallel workstreams —
▸ Plantweb Integration Stage 1 scoping
Sensor-to-Plantweb telemetry, electrolyte-health + Cu-leach schema, Aqueous Insight requirements doc. Hands off to Phase 2 implementation. Logan Woolery upstream.
▸ Copper Recovery Stage 0 → 1
Electrowinning + dendritic capture. The perpetual cathode loop: Cu²⁺ re-precipitates as next-generation CuFe-PBA. Closes both the electrolyte AND cathode material loops.
▸ CityU HK · IP Licensing Stage 0 trigger
Chen group, City University of Hong Kong. License-terms engagement gated to Stage 0 go-decision. Jennie Li (Emerson China GM) is the operational link to the research group.
▸ Zero-Discharge Infrastructure Stage 1 build
Solvent recovery still, electrowinning rig, NaOCl detox loop. Already inside the $1.0–1.8M ceiling. No effluent leaves the lab. Compliant with GB 18599 / ISO 14001 / RCRA.
▸ Regulatory Compliance parallel through-line
GB 18599 / ISO 14001 / RCRA documentation trail begins at Stage 0. Carries through to Phase 3 with MnDNR + MPCA + EPA touchpoints. Required for any pilot deployment.
▸ Demo-Unit Customer Pipeline begins month 18
Phase 3 pilot-site identification: data centers, mining sites, microgrid operators. Phased outreach gated on signal strength — depth-of-need, regulatory pressure, alignment with Emerson product surface. First customer dialogues open six months before commercial demo.
▸ Safety & Chemical Hygiene live before first electrolyte mix
OSHA chemical-hygiene plan, MSDS chain, PPE program, EHS training, and SOPs for MgCl₂ / HCl / NaOCl handling. Reviewed by Muck’s Safety org. Must be in place before the first cell is built — gates the start of Stage 1, not just discharge.
▸ Champions Routing in-flight, day-zero
Logan (review) → Rodolphe (floor sign-off, sponsors to Muck) → Muck (the hero — VP Global Ops, geothermal-pilot steward, runs all-employee meetings; carries this upward) → Stokes. Drip-drip; never hand the doc before it is asked for.
— THE MANIFEST —

What Shipped Last

Reverse chrono. One line each. Nothing editorialized.

2026-06-11
Hub LIVE at saltwaterpower.org — Cloudflare Pages deployed (10 files), custom domain bound with SSL active, Pulse Worker deployed with KV+cron (nightly RSS refresh at 04:00 UTC starts populating the dashboard tonight). Email Routing deferred (token permission gap, non-critical). Access gate not yet configured — public for now. Deploy log: briefs/2026-06-11_cloudflare_deploy_log.md.
2026-06-10
Fact-check round 2 corrections shipped — three-agent external verification caught: diesel 5–15% energy claim (was conflated with capacity, now reframed to ~55 GW backup capacity story); iron-air delivery dates (Form Energy first commercial pilot delivered Q4 2025 at Cambridge MN, ~50 min from Shakopee — was wrongly stated as "not until 2028"); 42 GWh head start (now >75 GWh order book); JACS framing (softened to "ultra-long cycling" not "chemistry class"); copper LME ($12 → $13–14/kg); Sherco Solar (460 → 710 MW). Brief: briefs/2026-06-10_forcebox7_claims_verification.md.
2026-06-10
Muck-as-hero reframe — force-box #6 + Champions tributary + champion roster + memory routing plan now lead with Michael Muck (VP Global Ops & Supply Chain). Rodolphe stays as floor-relationship enabler. Photo placeholder (MM monogram) pending real headshot.
2026-06-10
Force-box #7 hardened — diesel-replacement category positioning quantified with LCA carbon (8–30 g CO2-eq/kWh delivered, 60–90% lower than LFP), iron-air structural costs named, 2025-2030 deployment race conceded to Form Energy with 2028-2040 second wave claimed for Mg-ion.
2026-06-10
Force-box #7 hedged — diesel-replacement category positioning revised to reflect Form Energy/iron-air commercial momentum (Google MN 30 GWh, Crusoe 12 GWh, CATL grid sodium-ion); Mg-ion now positioned as the ESG-depth answer within the category, not the only path.
2026-06-10
CuFe-PBA cathode verified — Chen et al. cathode composition confirmed against secondary citation (paper PDF still paywalled); load-bearing for the Copper tributary. Verification trail at briefs/2026-06-10_cufe_pba_verification.md.
2026-06-10
Synchros hook captured — Emerson May 20 launch of Synchros (IIoT wireless platform in Logan’s portfolio) becomes the conversation opener for the Logan-step routing. Memory: project_emerson_synchros_hook_2026_06_10.md.
2026-06-10
Champions facts re-verified — Train, Logan, Stokes, Muck current; Rodolphe still requires logged-in LinkedIn confirmation. Stokes location corrected (Minneapolis–St. Paul, not Houston).
2026-05-27
AWS S3 nightly backup wired — emerson.tar.gz auto-uploads 03:30 CT to s3://kalshi-bot-backup-188860181710/daily/. Disaster recovery for hub + briefs + proposal source.
2026-05-27
Artifact consolidation — hub + briefs + proposal source moved to ~/Documents/emerson/, reverse symlinks preserve deploy paths. All future artifacts route here.
2026-05-14
Safety & Chemical Hygiene — added as 8th tributary; gates Stage 1 wet work. BOM long-lead notes folded into Stage 1 detail.
2026-05-14
Where We Are Now — live-state page added as card 09 of the hub 09_now.html
2026-05-14
The Pulse — resistance-tracker frame added as card 08, three-column dashboard, RSS-driven 08_pulse.html
2026-05-13
saltwaterpower.org — domain registered (Cloudflare, ICANN-verified, expires 2027-05-13)
2026-05-13
Hub deployment architecture — Pages + Custom Domain + Email Routing + Worker + Access wired through Cloudflare
2026-05-12
Eleven Histories — closing sequence renamed; subtitle Eleven Frames · 36 Centuries
2026-05-12
Walkthrough v2 — digital-twin states across 19 equipment boxes with idle/running/fault emissive driver
2026-05-12
Hub front door — five card titles rewritten for narrative clarity: Lab Manual · Floor Plan · Peek Inside · Tour the Lab · Eleven Histories
2026-05-11
Force-box #5 added to proposal — "The Recurring Revenue Is a Plantweb Insight Expansion" rewires the political route from Stokes broad-budget to Logan's Plantweb P&L
2026-05-10
Salt Kitchen visual language — unified across proposal, protocol, floor plan, isometric, walkthrough, and closing sequence
2026-05-09
Phase 1 protocol shipped — sixteen-section experimental protocol with analytical chain of custody and zero-discharge SOPs
2026-05-08
Lab floor plan + isometric — 2,500 sq ft Shell Space layout with NI / Rosemount / DeltaV placement and recovery-rig footprint